15-12-2011
In connection with the service of turbines at Lillgrund Offshore Wind Farm, GEO carried out a Site Clearance Survey for a jack-up platform installation. GEO conducted a sidescan sonar survey at two foundations in order to identify objects that could hinder the installation of the jack-up platform. GEO was contracted by Siemens Wind Power A/S.